Jonathan Wayne
Initial layout of collapsable armature. Initial layout of collapsable armature (open.) Initial layout of collapsable armature (closed.) The inspiration. Collapsable armature v2.0. Collapsable armature v2.0 (open.) Collapsable armature v2.0 (semi-closed.) Collapsable armature v2.0 (closed.) Compressed peat bricks before cutting. Peat obelisk model bricks.
Detail of Peat Obelisk model Peat Obelisk model with armature. Peat Obelisk model. Peat Obelisk model weathering 1A. Peat Obelisk model weathering 1B. Peat Obelisk model weathering 2A. Peat Obelisk model weathering 3A. Peat Obelisk model weathering 4A. Jig with reed brick v.2.0. Reed brick prototype v.2.0. Reed brick prototype v.3.0. Reed brick jig with thin wires. Jig with reed bricks v.4.0. Jig with reed bricks v.4.0. Reed bricks v.4.0. Reed bricks dry fitted.
New Works In Progress
Process shots of new Transient Memorials that are in development and will be constructed in Ireland in the summer of 2010 and Detroit in the fall of 2010.
BACK TO PORTFOLIO